Which major bridge project required subsurface profiling due to liquefiable soil layers?
Answer & Solution
Correct Answer:
Option
C
The Bandra-Worli Sea Link was constructed on reclaimed coastal soils. Extensive geotechnical investigations found liquefiable layers, and deep pile foundations were adopted to mitigate seismic risks.