Which of the following techniques helped manage groundwater during Delhi Metro Phase 3 tunneling?

Answer & Solution
Correct Answer: Option D
Recharge wells were installed to maintain the groundwater table and reduce drawdown, protecting surrounding structures and ecosystems.