Which of the following was a geological risk in the construction of the Burj Khalifa?
Answer & Solution
Correct Answer:
Option
C
Saline groundwater in the Dubai region posed challenges for foundation corrosion. Advanced concrete mix designs and waterproofing were used to mitigate these effects.