Work study is mainly aimed at
A. Determining the most efficient method of performing a job
B. Establishing the minimum time of completion of a job
C. Developing the standard method and standard time of a job
D. Economizing the motions involved on the part of the worker while performing a job
Answer: Option A
Solution(By Examveda Team)
Work study is mainly aimed at Determining the most efficient method of performing a jobJoin The Discussion
Comments ( 2 )
Related Questions on Industrial Engineering and Production Management
The essential condition for the decompression of an activity is that
A. The project time should change due to decompression
B. After decompression the time of an activity invariably exceeds its normal time
C. An activity could be decompressed to the maximum extent of its normal time
D. None of the above
A. CAM < DAM
B. CAM > DAM
C. CAM = DAM
D. There is no such criterion
Developing the standard method and standard time of a job
C. Developing the standard method and standard time of a job