Learn Railway Engineering MCQ questions & answers are available for a Civil Engineering students to clear GATE exams, various technical interview, competitive examination, and another entrance exam. Railway Engineering MCQ question is the important chapter for a Civil Engineering and GATE students. Page-8 section-1
Each section contains 100 MCQs on
Railway Engineering .
Consider the following surveys
i) Reconnaissance survey
ii) Preliminary survey
iii) Traffic survey
iv) Location survey
The correct sequence in which these surveys are conducted before the alignment of a track is finalised is
The load on each axle of a locomotive is 22 tonnes. If the coefficient of friction is 0.2, then the hauling capacity due to 3 pairs of driving wheels will be