71. In the Petronas Towers project, deep foundations were used due to:
72. The Tokyo Bay Aqua-Line tunnel used which construction method to combat high water pressure?
73. What factor contributed to excessive ground settlement during the Bangkok Subway construction?
74. The primary purpose of grouting in the K�rahnj�kar Hydropower tunnels (Iceland) was to:
75. What was a key design element in preventing landslide hazards during the Atal Tunnel construction?
76. What was the main geological challenge during the construction of the Karakoram Highway?
77. In the Tehri Dam project, what type of rock posed stability concerns?
78. The main cause of slope instability during the Malin Landslide in India was:
79. What was the innovative solution adopted for tunneling in water-bearing ground in Kolkata Metro�s East-West corridor?
80. In the Srisailam Hydroelectric Project, what was the main geological issue encountered?
Read More Section(Case Studies and Applied Geological Engineering Projects)
Each Section contains maximum 100 MCQs question on Case Studies and Applied Geological Engineering Projects. To get more questions visit other sections.