51.
The collapse of the Highland Towers in Malaysia (1993) was primarily due to:

52.
In the Qanats (Iran), traditional engineering techniques addressed which geological condition?

53.
The Siah Bisheh Hydropower project in Iran required special design due to:

54.
The primary reason behind the success of the Jubilee Line Extension (London) in geotechnical terms was:

55.
Which engineering structure experienced failure due to expansive clays in its foundation?

56.
In the construction of Itaipu Dam, what was the significant rock engineering challenge?

57.
The Boston Big Dig project faced severe delays due to:

58.
Which of the following is an example of proactive geotechnical monitoring in large-scale tunneling?

59.
In the El Teniente mine tunnels (Chile), which hazard required continual monitoring?

60.
What was a geotechnical benefit of the East Side Access tunnel project (NYC)?