Examveda
Examveda

In case of laying gullies, siphons, intercepting traps, the cost includes

A. Setting and laying

B. Bed concreting

C. Connection to drains

D. All of these

Answer: Option D


This Question Belongs to Civil Engineering >> Estimating And Costing

Join The Discussion

Related Questions on Estimating and Costing