?
Match the following
Match the following
| List-I (Elements of Production Control) | List-II (Elements) |
| a. Control of Due Dates | 1. Planned Schedules |
| b. Control of Quality | 2. Inspection |
| c. Control of Tooling | 3. Cribs |
| d. Control of Materials | 4. EOQ |
Join the Discussion
Login to post a comment or share your explanation.
Login