Select the incorrect statement

A. The loss of prestress is more in pre-tensioning system than in post-tensioning system.

B. Pretensioning system has greater certainty about its durability.

C. For heavy loads and large spans in buildings or bridges, post-tensioning system is cheaper than pretensioning system

D. none of the above

Answer: Option D