The expected out turn for earth work in excavation in ordinary soil per workman per day is
A. 1.00 cum
B. 2.00 cum
C. 3.00 cum
D. 4.00 cum
Answer: Option C
A. 1.00 cum
B. 2.00 cum
C. 3.00 cum
D. 4.00 cum
Answer: Option C
A. Mid-section formula
B. Trapezoidal formula
C. Prismoidal formula
D. All the above
Size, capacity and materials need be specified for
A. Bib-cocks
B. Stop-cocks
C. Ball valves
D. All the above
The expected out turn of 12 mm plastering with cement mortar is
A. 2.5 sq m
B. 4.0 sq m
C. 6.0 sq m
D. 8.0 sq m
A. Excavation
B. Surface dressing
C. Cutting
D. Surface excavation