The measurement is made for stone work in square metre in case of
A. Wall facing
B. Columns, lintels, copings
C. Building work
D. (A) and (B) of the above
Answer: Option D
A. Wall facing
B. Columns, lintels, copings
C. Building work
D. (A) and (B) of the above
Answer: Option D
A. Mid-section formula
B. Trapezoidal formula
C. Prismoidal formula
D. All the above
Size, capacity and materials need be specified for
A. Bib-cocks
B. Stop-cocks
C. Ball valves
D. All the above
The expected out turn of 12 mm plastering with cement mortar is
A. 2.5 sq m
B. 4.0 sq m
C. 6.0 sq m
D. 8.0 sq m
A. Excavation
B. Surface dressing
C. Cutting
D. Surface excavation