The weight of reinforced concrete, is generally taken as

A. 2200 kg/m3

B. 2300 kg/m3

C. 2400 kg/m3

D. 2500 kg/m3

Answer: Option D


This Question Belongs to Civil Engineering >> RCC Structures Design

Join The Discussion

Comments ( 7 )

  1. MUHAMMAD USMAN
    MUHAMMAD USMAN :
    2 months ago

    2500kg/m^3 RCC
    2400kg/m^3 PCC

  2. Moni Basar
    Moni Basar :
    3 years ago

    2500kg/m3

  3. Moni Basar
    Moni Basar :
    3 years ago

    2500 kg/m3

  4. Mayur Devtale
    Mayur Devtale :
    3 years ago

    2400

  5. Muhammad Saqib
    Muhammad Saqib :
    4 years ago

    2400 kg/m3--->R.C.C
    2200 kg/m3--->P.C.C

  6. M.Ahmad Fraz
    M.Ahmad Fraz :
    5 years ago

    2400 KG/m3 is correct

  7. Ajay Kumar
    Ajay Kumar :
    6 years ago

    Sir
    2500kg /m3

Related Questions on RCC Structures Design

If the shear stress in a R.C.C. beam is

A. Equal or less than 5 kg/cm2, no shear reinforcement is provided

B. Greater than 4 kg/cm2, but less than 20 kg/cm2, shear reinforcement is provided

C. Greater than 20 kg/cm2, the size of the section is changed

D. All the above