Join The Discussion

Comments ( 4 )

  1. Hassan Ahmad
    Hassan Ahmad :
    4 months ago

    correct answer. the relation of the workability with the time of transit is inverse.
    workability decreases with the time.

  2. Ramesh Pathlavath
    Ramesh Pathlavath :
    4 years ago

    https://www.quora.com/What-is-the-minimum-grade-of-concrete-for-RCC-work#:~:text=As%20per%20IS%20456%3A2000,not%20be%20less%20than%20M20.

  3. Ramesh Pathlavath
    Ramesh Pathlavath :
    4 years ago

    Water cement ratio answer maybe ... spelling mistakes in this also .. please correctly say

  4. Ramesh Pathlavath
    Ramesh Pathlavath :
    4 years ago

    I was found answer Water cement ratio in online everywhere ... please check this

Related Questions on Concrete Technology and Design of Concrete Structures

The diameter of ties in a column should be

A. More than or equal to one fourth of diameter of main bar

B. More than or equal to 5 mm

C. More than 5 mm but less than one-fourth of diameter of main bar

D. More than 5 mm and also more than one-fourth of diameter of main bar