51
Pick up the correct statement regarding drilling a tunnel from the following:
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
52
Pick up the correct statement from the following:
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
53
If ‘N’ is the number of shafts used, then the total number of faces available for attacking the excavation and construction in tunnels are
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
54
For highways, tunnelling is preferred to if the open cut exceeds:
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board
55
Forepoling method is generally adopted for tunnelling in:
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
56
A tunnel is found more advantageous as compared to the alternate routes because it:
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
57
The needle beam method of tunnelling
(i) Is suitable for soils in which roof can stand for few minutes without support
(ii) Is suitable for brick lining
(iii) Is suitable for concrete lining
(iv) Requires large number of trench jacks
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board
58
Concrete lining is provided concurrently with the driving operation in case of
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
59
In “full face” method of constructing tunnels, the first operation relates to
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
60
The following operations are generally employed for tunnelling in hard rock.
1.Removing ground water,
2.Loading holes and firing the explosive
3.Setting up and drilling
4.Grouting and lining
5.Removing muck
6.Ventilation and removing explosion dust
The correct sequence is:
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board