Learn Tunnel Engineering MCQ questions & answers are available for a Civil Engineering students to clear GATE exams, various technical interview, competitive examination, and another entrance exam. Tunnel Engineering MCQ question is the important chapter for a Civil Engineering and GATE students. Page-6 section-1
51
Pick up the correct statement regarding drilling a tunnel from the following:
The needle beam method of tunnelling (i) Is suitable for soils in which roof can stand for few minutes without support (ii) Is suitable for brick lining (iii) Is suitable for concrete lining (iv) Requires large number of trench jacks
The following operations are generally employed for tunnelling in hard rock. 1.Removing ground water, 2.Loading holes and firing the explosive 3.Setting up and drilling 4.Grouting and lining 5.Removing muck 6.Ventilation and removing explosion dust The correct sequence is: