ExamVeda
Login
Home
31
For initial surveys of tunnels, the following activities are involved:
1.Marking portal point with concrete pillars on the ground
2.Marking tunnel obligatory points on the topographical maps
3.Preliminary setting of the tunnel on the topographical Survey of India maps
4.Driving lines between the fixed obligatory points
The correct sequence of the activities is:
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
32
In Belgium method of tunnelling
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board
33
The advantages of providing a pair of tunnels as compared to only one large highway tunnel is:
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
34
Which one of the following methods is adopted for permanent drainage of tunnels?
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
35
What is the correct sequence of the following events of construction of a shaft in rock?
1) Drilling and blasting
ii) Timbering
iii) Pumping
iv) Mucking
Select the correct answer
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board
36
Which one of the following is a component of a shield for tunneling?
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
37
The correct sequence of drilling equipment for increasing size of holes in tunnels is
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
38
The difference of heights of the tunnels above rail tops of BG and MG tracks is kept
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
39
For hauling muck from the tunnel, the following type of muck-car is used:
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
40
For B.G. single track, the section of the tunnel must have a width
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board