21. Which tunneling project used the "New Austrian Tunneling Method (NATM)" effectively in difficult rock conditions?
22. In the construction of the Three Gorges Dam, what geological issue required major intervention?
23. Which geotechnical challenge occurred during the construction of the Chunnel (Channel Tunnel)?
24. What technique was used in the Palm Jumeirah project to stabilize reclaimed land?
25. The 2001 Bhuj earthquake revealed what about foundation design in some buildings?
26. Which geophysical method was used to detect voids beneath a dam in a case study?
27. What engineering measure helped prevent landslide reactivation in the Malin landslide area (India)?
28. What is a common rock type involved in tunneling hazards due to swelling and squeezing?
29. What failure occurred in the St. Francis Dam in 1928 due to overlooked geology?
30. Which project faced challenges due to deep peat layers affecting pile foundations?
Read More Section(Case Studies and Applied Geological Engineering Projects)
Each Section contains maximum 100 MCQs question on Case Studies and Applied Geological Engineering Projects. To get more questions visit other sections.