The plinth area of a building not includes
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
32
In the mid-section formula
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
33
The inspection pit or chamber is a manhole provided in a base drainage system
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
34
The cross-sectional area of the embankment of a canal fully in embankment in the given figure is
Estimating and Costing mcq question image
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
35
Anti-siphonage pipe is connected to
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
36
The 'centre line method' is specially adopted for estimating
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
37
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board
38
According to ISI method of measurement, the order of the sequence is
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
39
The rate of an item of work depends on
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
40
The cross-sections for a highway is taken at
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board