41
If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm2 and bond stress is 6 kg/cm2, the required bond length of the rod is
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
42
The most reliable estimate is
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
43
The main factor to be considered while preparing a detailed estimate, is
Discuss
Answer & Solution
Answer: Option D
Solution:
Definition: A detailed estimate is a comprehensive calculation of the quantities and costs of all items required for the execution of a construction project.

Main factors: While preparing a detailed estimate, several aspects must be considered, including the quantity of materials, their availability, and the transportation arrangements to the site.

Reason: The quantity of materials directly affects the total cost and ensures sufficient supply for uninterrupted work. The availability of materials determines procurement timelines and can influence choice of suppliers and scheduling. The transportation of materials impacts delivery efficiency, cost, and timely completion of the project.

Conclusion: All these factors are interlinked and crucial for accurate cost estimation and smooth project execution, hence all the above is the correct answer.
44
The order of booking dimensions is
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
45
The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is
Estimating and Costing mcq question image
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board
46
The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board
47
Pick up the correct statement regarding the centre line method of estimating a building
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
48
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
49
For 100 sq. m cement concrete (1 : 2 : 4) 4 cm thick floor, the quantity of cement required, is
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board
50
The measurement is not made in square meters in case of
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board