91. In the construction of the Metro in Kolkata, ground settlement was mainly due to:
92. Which method was used to support deep excavation in soft clay during the Singapore Downtown Line project?
93. In which case study did a major landslide result from poor drainage in a hill cutting?
94. The East-West Metro Tunnel under the Hooghly river was executed using:
95. Which hazard was encountered during excavation of the Brenner Base Tunnel?