11.
Which parameter was critical in designing foundations for the Petronas Towers in Kuala Lumpur?

12.
In the Bhuj Earthquake (2001), why did many buildings fail despite being away from the epicenter?

13.
Which geological technique was used in tunneling for Metro Rail projects in Delhi?

14.
What factor caused the failure of the St. Francis Dam (California, 1928)?

15.
In the Sikkim Himalayas, what geological constraint affects road construction?

16.
What major geological factor delayed the construction of the Boston Big Dig project?

17.
Which stabilization technique was used in the case study of the unstable Nilgiris slopes in India?

18.
In the case of the Tehri Dam in India, which seismic consideration was most critical?

19.
What was the main cause of tunnel face collapse in the Heathrow Express Rail Link project?

20.
In the Kaliasaur landslide case in Uttarakhand, which geological structure played a key role in slope failure?