CPM is
Discuss
Answer & Solution
Answer: Option D
Solution:
CPM is
- Synthesizing in concepts
- Is built of activities oriented programmes
- Is used for repetitive works
92
CPM is the
Discuss
Answer & Solution
Answer: Option C
Solution:
CPM is the Activity oriented technique
93
CPM requires
Discuss
Answer & Solution
Answer: Option A
Solution:
Correct Answer: A: Single time estimate
Let's break down why!
CPM stands for Critical Path Method.
It's a project management technique.
CPM focuses on activities with a fixed, known duration.
Think of it like this: you know exactly how long each task will take.
Therefore, CPM only needs a single time estimate for each activity.
Options B and C (Double and Triple time estimate) are related to PERT, another project management technique.
PERT deals with uncertainty and uses multiple time estimates.
94
CPM stands for
Discuss
Answer & Solution
Answer: Option B
Solution:
CPM stands for Critical Path Method
95
Inventory control in production, planning and control aims at
Discuss
Answer & Solution
Answer: Option C
Solution:
Inventory control in production, planning and control aims at Acceptable customer service at low capital investment in inventory
96
The most important objective behind plant layout is
Discuss
Answer & Solution
Answer: Option A
Solution:
The most important objective behind plant layout is overall simplification, safety of integration.
97
In fixed position layout
Discuss
Answer & Solution
Answer: Option D
Solution:
In fixed position layout
- Total production cost is less
- Material movement is less
- Capital investment is minimum
98
Linear programming can be applied successfully to
Discuss
Answer & Solution
Answer: Option D
Solution:
Linear programming can be applied successfully to Chemical industry, Oil industry and Banks.
99
Which of the following wage incentive plan is applied to all workers?
Discuss
Answer & Solution
Answer: Option A
Solution:
Under Halsey premium plan method, standard time for doing each job or operation is fixed and the worker is given wages for the actual time he takes to complete the job or operation at the agreed rate per hour plus a bonus equal to (usually) one-half of the wages of the time saved.
100
In which of the following layouts, the lines need to the balanced
Discuss
Answer & Solution
Answer: Option B
Solution:
the lines need to the balanced in product layout