1.
Time study is

2.
The chart which gives an estimate about the amount of materials handling between various work stations is known as

3.
One of the basic essentials of an incentive plan is that

4.
Standard time as compared to normal time is

5.
The correct sequence of phases in value engineering is

6.
The reasons which are basically responsible for the formation of a queue should be that

7.
For ship vessel industry the following layout is best suited

8.
Breakeven analysis is a

9.
The deductions for, employees provident fund start

10.
PERT/CPM, techniques can be used for following applications

Read More Section(Industrial Engineering and Production Management )

Each Section contains maximum 100 MCQs question on Industrial Engineering and Production Management . To get more questions visit other sections.