11
The production scheduling is simpler and high volume of output and high labour efficiency are achieved in the case of
Discuss
Answer & Solution
Answer: Option A
Solution:
The production scheduling is simpler and high volume of output and high labour efficiency are achieved in the case of product layout.
12
Expediting function consists in keeping a watch on
Discuss
Answer & Solution
Answer: Option B
Solution:
Expediting function consists in keeping a watch on Flow of material and in case of trouble locate source of trouble
13
Travel charts provide
Discuss
Answer & Solution
Answer: Option B
Solution:
Travel charts provide a compact estimate of the handling which must be done between various work sections
14
Inventory management consists of
Discuss
Answer & Solution
Answer: Option D
Solution:
Inventory management consists of
- Effective running of stores
- State of merchandise methods of storing and maintenance etc.
- Stock control system
15
Which of the following statement is correct?
Discuss
Answer & Solution
Answer: Option A
Solution:
A-B-C analysis is based on Pareto's principle
16
Which of the following statement is correct?
Discuss
Answer & Solution
Answer: Option D
Solution:
- When slack of an activity is zero, it falls only on critical path.
- CPM technique is useful to minimize the direct and indirect expenses.
- Critical path of a net work represents the minimum time required for completion of project.
17
In the perpetual inventory control, the material is checked when it reaches its
Discuss
Answer & Solution
Answer: Option A
Solution:
In the perpetual inventory control, the material is checked when it reaches its Minimum value
18
Basic motion time study gives times for basic motions in ten thousandths of
Discuss
Answer & Solution
Answer: Option B
Solution:
Basic motion time study gives times for basic motions in ten thousandths of minute.
19
Pick up the correct statement about relationship between various floats
Discuss
Answer & Solution
Answer: Option D
Solution:
Independent float < free float
20
The aim of value engineering is to
Discuss
Answer & Solution
Answer: Option C
Solution:
The aim of value engineering is to Minimize the cost without change in quality of the product