71
Which of the following statement is wrong?
Discuss
Answer & Solution
Answer: Option D
Solution:
The performance of a specific task is called an activity.
An event is an instantaneous point in time at which an activity begins or ends.
72
Which of the following are the principles of material handling?
Discuss
Answer & Solution
Answer: Option D
Solution:
The principles of material handling are listed below:
- Keep all the handling to the minimum
- Select only efficient handling equipment
- Move the heaviest weight to the least distance
73
Templates are used for
Discuss
Answer & Solution
Answer: Option A
Solution:
Templates are used for a planning layout.
74
Performance rating is equal to
Discuss
Answer & Solution
Answer: Option D
Solution:
Performance Rating can be defined as the procedure in which the time study engineer compares the performance of operator(s) under observation to the Normal Performance and determines a factor called Rating Factor.
75
In value engineering, important consideration is given to
Discuss
Answer & Solution
Answer: Option D
Solution:
In value engineering, important consideration is given to Cost reduction
76
Military organisation is known as
Discuss
Answer & Solution
Answer: Option A
Solution:
Line organisation is the simplest and the oldest type of organisation. It is also known as scalar organisation or military type of organisation.
77
Military type of organisation is known as
Discuss
Answer & Solution
Answer: Option A
Solution:
Line organisation is the simplest and the oldest type of organisation. It is also known as scalar organisation or military type of organisation.
78
Process layout is employed
Discuss
Answer & Solution
Answer: Option D
Solution:
Process layout is employed
- Where low volume of production is required
- Where similar jobs are manufactured on similar machines
- Where machines are arranged on functional basis
79
Product layout is used for
Discuss
Answer & Solution
Answer: Option C
Solution:
Product layout is used for Mass production
80
The unit cost in case of batch production is __________as compared to jobbing production.
Discuss
Answer & Solution
Answer: Option B
Solution:
The unit cost in case of batch production is low as compared to jobbing production.