In Halsey 50-50 plan, output standards are established
Discuss
Answer & Solution
Answer: Option B
Solution:
In Halsey 50-50 plan, output standards are established From previous production records
72
Queuing theory is associated with
Discuss
Answer & Solution
Answer: Option C
Solution:
Queueing theory is the mathematical study of waiting lines, or queues. A queueing model is constructed so that queue lengths and waiting time can be predicted
73
Break-even analysis can be used for
Discuss
Answer & Solution
Answer: Option A
Solution:
Break-even analysis is a technique widely used by production management and management accountants.
Total variable and fixed costs are compared with sales revenue in order to determine the level of sales volume, sales value or production at which the business makes neither a profit nor a loss.
74
Work study is mainly aimed at
Discuss
Answer & Solution
Answer: Option A
Solution:
Work study is mainly aimed at Determining the most efficient method of performing a job
75
A company spends considerable amount on publicity to promote sales. This expenditure in break even chart is shown below the
Discuss
Answer & Solution
Answer: Option B
Solution:
A company spends considerable amount on publicity to promote sales. This expenditure in break even chart is shown below the Variable cost line
76
Positive slack on a PERT indicates that project is
Discuss
Answer & Solution
Answer: Option A
Solution:
A positive slack indicates the amount of time that the task can be delayed without delaying the project finish date.
77
Break-even point is the point where
Discuss
Answer & Solution
Answer: Option D
Solution:
Break-even point is the point where Sales revenue and total expensive lines intersect
78
Which of the following plans motivates supervisors by paying a premium on time saved by workers?
Discuss
Answer & Solution
Answer: Option C
Solution:
Haynes plans motivates supervisors by paying a premium on time saved by workers
79
Scheduling
Discuss
Answer & Solution
Answer: Option B
Solution:
Scheduling is the process of arranging, controlling and optimizing work and workloads in a production process.
Companies use backward and forward scheduling to allocate plant and machinery resources, plan human resources, plan production processes and purchase materials
80
'Value' for value engineering and analysis purposes is defined as
Discuss
Answer & Solution
Answer: Option D
Solution:
'Value' for value engineering and analysis purposes is defined as cost