Colour of the semaphore distant signal is ________.
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
2
Colour of the semaphore shunt signal is ________.
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
3
Calling on signal shows ________ light in off position in two aspect signalling system.
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
4
Adequate distance means the distance sufficient to ensure ________.
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
5
Mixed and Goods trains worked with vacuum throughout, the following number of vehicles can be attached in rear of BV.
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
6
Second train during TSL will be dispatched after ________.
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
7
Speed of a passenger train passing through loop line on a station equipped with STD III interlocking?
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
8
For work of long duration, the stop indicator must be erected at not less than
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
9
Traffic gates are those located between ________.
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
10
Maximum speed of trains during thick & foggy weather in absolute block system is ________ kmph
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board