1. Normally the train with hot axle is admitted on ________.
2. Which is the following pairs of regional Railways and their headquarters not true?
3. Signal that controls the entry of trains into the block section in advance is called as
4. Second train during all communication failure shall be dispatched after an interval of
5. When the train catches fire, that carriage must be ________.
Read More Section(Indian Railway)
Each Section contains maximum 70 questions. To get more questions visit other sections.
- Indian Railway - Section 1
- Indian Railway - Section 2
- Indian Railway - Section 3
- Indian Railway - Section 4
- Indian Railway - Section 5
- Indian Railway - Section 7
- Indian Railway - Section 8
- Indian Railway - Section 9
- Indian Railway - Section 10
- Indian Railway - Section 11
- Indian Railway - Section 12
- Indian Railway - Section 13