ExamVeda
Login
Home
41
If the signal is continuously bobbing/flickering, the signal is treated as showing ________ aspect.
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
42
When the signal is blank in MACLS system, it is treated as showing ________ aspect.
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board
43
What will be maximum speed during shunting of goods train?
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board
44
No. of vehicles that can be attached to goods trains in rear of BV is
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
45
Station limit is the portion between ________.
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
46
If a staff is absent for ________ days from duty fresh declaration must be obtained
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board
47
During single line working on double line in automatic area the speed of all train running in wrong direction shall not exceed
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
48
The length of long welded rail under Indian conditions should be about
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
49
What does the Slip siding protects?
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
50
Where the caution indicator placed in BG if the engineering work is more than one days and train not to be require to stop at site?
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board